Qualification work is part of the price

Camera inspection, locating, heavy cleaning, root cutting, scale removal, and pipe measurement may be required before lining or bursting. A severely offset, collapsed, or poorly sloped line can require excavation even when most of the project is trenchless.

  • Lining versus pipe bursting
  • Pipe diameter and total installed length
  • Number of access pits and branch connections
  • Curing, testing, and warranty requirements

Measure value by the disruption avoided

A trenchless proposal may be valuable because it avoids removing a driveway, patio, finished floor, or major landscaping. Compare the total project—including required pits and restoration—with a complete open-trench alternative.